Soon the move repairs Vilnius Street 3 in ełk
Completed tender procedures and will soon move the work in connection with the upgrading of roads and sidewalks. Vilnius ' 3. The total value of the investment is ok. 81 thousand. zł.

Has been settled and determined by the contractor of the investment on the pavement of the road and sidewalks. Vilnius ' 3 in Elk.

As part of the work will be done m.in:

·         demolition of the curb and concrete edging

·         demolition of the surface of the road and the pavement surface

·         the execution of paving sidewalks with concrete block-ok. 60 m

·         execution of the surface of the roadway with concrete block-ok. 100 m

·         adjustment of the sewage wells-10 PCs.

·         control of street drains, wells, and water and gas valves Małopolska

The contractor selected in tender is Sonar m. Naruszewicz, r. t. Soroka Partnership in Elk.
The total value of the investment is £ 80865.99,

Expected date of completion of the investment to the end of September 2017.