News

Author: Cezary Wenda | Entry date: 11 January 2018
City of Elk has an invitation to tender for the further expansion of the PUG in ełk
Has been settled and will soon be signed the contract with the contractor on the successive stages of the development of the municipal social welfare centre in Elk. The total cost of the investment is 766 thousand. zł.

Activities are intended to improve access to social and health benefits for the residents of Elk and the fight against social exclusion and poverty.

The town of Ełk resolved the next invitation to tender for the remodeling and expansion of the PUG in Elk. Piłsudski 8 (4-7).

The work has been divided into stages and will be consisted of m.in. on:

Stage 4

·    superstructure along with the expansion of the East Wing of the building (the terrace) with additional rooms on the South side

·    the superstructure of the existing terrace up to the second floors

·    expansion of the building of additional facilities on the floor

·    thermal modernization wing building

Stage 5

·         renovation of the basement stairwell and wiatrołapu

Stage 6

·         thermal modernization building along with the renovation of roofing

Stage 7

·         development and arrangement of land around the building

·         the construction of the walk and travel

·         establishment of green

·         the execution of sanitary installations sanitary accessories

·         the execution of electrical installations, Małopolska and video surveillance with accessories

The work will be carried out in the building, so residents will not have a problem with access to the services provided by the resort.

So far, realized it was stage 1 and work is ongoing on the implementation of phases 2 and 3. The total cost of the investment. 1.2 million.