News

Author: Z. Dąbrowski | Entry date: 04 July 2017
Water park in Elk open again
Ended up with a technical break in the water park. The total cost of restoration-repair work is ok. 30 thousand. zł.

In connection with the planned restorative water Park was closed in the period from 12 June to 2 July 2017.

During the 3 week breaks have been made renovation and restoration, including m.in:

  • painting the pool Hall (part of)
  • refreshing the lobby walls, staircase, and the locker room # 1
  • Supplement cavities tiles on the pool hall
  • maintenance of technical equipment
  • installation of modern air conditioning in the fitness room

The total cost of the work carried out is 30 250 zł

Changes in the water park!

  • Revision of the rules of the individual attractions at the water park
  • Changes in the use of the object, including: children up to the age of 13 not to stay in the swimming pool
  • The sauna during the summer (July-August) will be open from 16.00 hrs. 12:00